A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | Y | Z Weighted scoring model: a technique that provides a systematic process for basing project selection on numerous criteria. Withdrawal mode: retreating or withdrawing from an actual or potential disagreement. Work authorization system: a method for ensuring that qualified people do the work at the right time and in the proper sequence.
Work breakdown structure (WBS): an outcome-oriented analysis of the work involved in a project that defines the total scope of the project. Work package: a deliverable or product at the lowest level of the WBS. A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | Y | Z
|